• Ghantoot Electrical and power Division

Projects

220/33 kV (63MVA), 220/11 kV (40MVA) Substations ICAD
33/11 kV (80MVA) Substation, Al-Reef
AADC Contract no. A-4606
33/11kV, 80MVA Substation M41 ICAD
Transco Contract no. N-4610
ADDC Contract no. D-7404
Transco Contract no. N-6377-S

Project Gallery

EPC of 220/33kV, 33/11kV substation including 220kV Double circuit underground cables from Transco substation, total length of 6 Km feeding power supply to steel factory substation complete with protection scheme at both ends along with all associated 33kV, 11kV and low voltage cabling works for Emirates steel factory in ICAD, Mussafah, Abu Dhabi.

Client: Al Naser Group

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects DivisionGhantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

EPC of 33/11kV Primary substation (80 MVA) including design and construction of civil substation building and supply installation, testing and commissioning of switch gears, transformers, SCMS, DMS, capacitor banks, DC system, fire fighting, HVAC and all related equipments complete with protection scheme at Al-Reef compound at Abu Dhabi.

Client: ADDC

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Supply and Installation of 18 Nos. (15 MVA) 33/11kV package type substations including complete assembly of switchgear containers and transformers along with all related civil works and 33kV power cable networks for Al Ain Industrial city.

Client: ADDC

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

EPC of 33/11kV Primary substation (80 MVA) including design and construction of civil substation building and supply installation, testing and commissioning of switch gears, transformers, SCMS, DMS, capacitor banks, DC system, fire fighting, HVAC and all related equipments complete with protection scheme at ICAD residential city Abu Dhabi.

Client: ADDC.

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

220kV power network development works for Emirates Iron and steel factory (EISF) including installation of 48 KM, 220kV cables in concrete trough and all associated cable sealing end and civil works at ICAD, Abu Dhabi.

Client: TRANSCO/Silec Cable

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Rehabilitation and refurbishment of 11/0.4kV distribution substation by replacing existing old ring main/switching stations with new GRP and precast substations (65 nos.) complete supply & installation of electrical equipments including all related civil, shutdown diversion works, testing and commissioning works at central region Abu Dhabi.

Client: ADDC.

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

132kV cabling works three circuits (29 Km) from Qusaidat Substation to Fila Substation and two circuits from outdoor cable Sealing end to new Khor kawier Substation (2.5KM) complete with cable sealing end structure & foundation at Ras Al Khaimah.

Client: TRANSCO/Sudkable.

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Ghantoot Electrical Projects Division

Designed by :